Coordinated demolition, relocation, and new work of existing and new ductwork required to convert from existing stack space to new rare book space over two phases to allow for handling and moving of books without utilizing outside storage.Master planned and provided schematic level documentation for mechanical room space to provide archival grade conditioning for the two rare book spaces including air handlers, desiccant dehumidification equipment, RO humidification equipment and systems, and process heating and cooling equipment.and 7,500 Sq.Ft.) and coordinated with architect regarding insulation and vapor barrier requirements. The future floor will be split into two rare book spaces inside glass enclosures (5,800 Sq.Ft.TEI master planned a phased conversion of the 5th floor route from an existing stack space to create an archival-grade controlled environment and included the following: Its also a great resource if you have an old edition. In order to complete the 6th floor renovations, a large area of rare books needed to be relocated from 6th floor to the 5th floor. Lippincott and Rosengarten have major textbooks on reserve, which is great if you lost/forgot a book.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |